Al Saeedi Chemical Factory required a robust and reliable solution for its external walls. The project’s challenges included stringent safety standards, exposure to harsh environmental conditions, and the need for a fast construction timeline to meet operational deadlines, ACFA Panel provided the answer to these challenges.

The factory’s construction team prioritized safety, requiring fire-resistant materials to ensure compliance with industrial regulations. ACFA Panels’ fire-resistant properties met this critical need, while their water-resistant nature added further protection against environmental wear and tear. Quick installation capabilities allowed the team to minimize downtime, keeping the project on track despite tight schedules. Additionally, managing the structural load was essential; the lightweight panels provided a solution that maintained stability without overburdening the foundation. By eliminating plastering, the project also benefited from substantial cost savings. Today, the Al Saeedi Chemical Factory stands as a model of industrial efficiency and safety, after overcoming all of the construction process’ challenges with the innovative use of ACFA Panels.

 

Project Overview

Project Name: Al Saeedi Chemical Factory

Location: Dammam, Saudi Arabia

Client/Owner: Al Saeedi Chemical Company

Architect/Designer:

Contractor:  Aldera International

Project Duration: 1 Month


Project Background

Objective: Development of robust, durable, and safety-compliant external walls.

Building Type: Industrial Facility

Scope of Work: External walls and structural efficiency.


Product and Material Details

Brand/Type: Acfa Light Weight Panels

Thickness/Dimensions: Standard Acfa Panel Specifications

Quantity Used: 600 SQM

Key Product Features:

Fire Resistance

Water Resistance

Lightweight

Durability


Installation Process

Preparation Work:
Panels were prepped for installation under stringent safety guidelines.

Installation Technique:

Fixing Methods: Panels were securely mounted to meet industrial standards.

Surface & Joint Treatments: Joints were treated with high-strength sealants for durability.

Challenges Faced:

Compliance with stringent safety regulations.

Tight timelines for operational readiness.

Solutions Implemented:

Lightweight materials eased installation and logistics.

Eliminated plastering reduced costs and time.


Outcomes and Benefits

Final Appearance:
A safe, durable, and operationally efficient chemical factory.

Performance Highlights:

Safety compliance with fire-resistant materials.

Quick construction to meet deadlines.

Client/Stakeholder Feedback:
Stakeholders recognized the innovative use of Acfa Panels in ensuring safety and durability while meeting construction deadlines.

 

 