Almakhzan Zati Project | Logistical Excellence in Warehousing :

Creating a cost-effective, high-performance warehouse to support Saudi Arabia’s logistics sector.

In the dynamic landscape of Saudi Arabia’s logistics sector, Almakhzan Zati Project set out to build a cost-effective warehouse that could withstand the demands of modern supply chains. The project faced multiple challenges, including budget constraints, tight deadlines, and the need for materials that could endure heavy usage.

Efficiency was critical, as delays in construction would have ripple effects on logistics operations. ACFA Panel rose to the challenge with its quick installation process, enabling the warehouse to commence operations ahead of schedule.

The lightweight nature of the panels reduced labor requirements and simplified handling, while their fire and water resistance ensured the building could withstand environmental and operational demands. Eliminating the need for plastering provided significant financial savings, allowing the project to allocate resources to other critical areas. Today, the Almakhzan Zati warehouse stands as a cornerstone of logistical operations, overcoming budgetary and operational challenges with the help of ACFA Panel.

Project Overview

Project Name: Almakhzan Zati Project

Location: Riyadh, Saudi Arabia

Client/Owner: Almakhzan Zati

Architect/Designer:

Contractor: Almakhzan Zati Contracting

Project Duration: 600 SQM


Project Background

Objective: Construction of a cost-effective and durable warehouse.

Building Type: Logistics/Warehouse Facility

Scope of Work: Exterior walls, partitions, and structural efficiency.


Product and Material Details

Fiber Cement Board Brand/Type: Acfa Light Weight Panels

Thickness/Dimensions: Standard Acfa Panel Specifications

Quantity Used: 600 SQM

Key Product Features:

Fire Resistance

Water Resistance

Lightweight

Cost Efficiency


4. Installation Process

Preparation Work:
Efficient planning to minimize construction delays and maximize logistical functionality.

Installation Technique:

Fixing Methods: Panels were mounted on durable frameworks designed to support heavy usage.

Surface & Joint Treatments: Acfa joint compound ensured long-term durability and reduced Finishing Work.

Painting/Finishing Work:
A smooth and professional finish added to the warehouse’s functionality and aesthetic.

Challenges Faced:

Tight deadlines are critical to operational readiness.

Budget constraints for a large-scale logistics project.

Solutions Implemented:

Eliminating plastering saves time and costs.

Lightweight panels reduced labor needs and structural load.


Outcomes and Benefits

Final Appearance:
A functional and cost-effective warehouse built to withstand operational demands.

Performance Highlights:

Accelerated construction timeline.

Reduced operational costs through innovative materials.

Client/Stakeholder Feedback:
Stakeholders commended the efficient and innovative approach using Acfa Panels, meeting operational goals ahead of schedule.

 

 

 

 

 

 