Riyadh Boulevard Project | A Vision of Modernity in Riyadh :
Bringing architectural innovation to life in the heart of Saudi Arabia’s capital, the Riyadh Boulevard Project overcame logistical and operational hurdles by utilizing the ACFA Panel.
In the bustling heart of Riyadh, where modernity meets tradition, the Riyadh Boulevard Project emerged as a beacon of architectural innovation. The developers faced multiple challenges, including tight deadlines, budget constraints, and the need for materials that could balance aesthetics with functionality. The solution? ACFA Panel, a game-changer in construction materials.
The team grappled with managing a large-scale construction project in a densely populated area, requiring materials that could be installed quickly to minimize disruption.
ACFA Panel provided an ideal solution with their quick installation—three times faster than traditional block work—enabling the team to stay ahead of schedule. The lightweight nature of the panels eased handling and reduced the structural load, simplifying logistics. The project saved over SR 30 per square meter by eliminating the need for plastering, significantly reducing costs. Moreover, the fire-resistant and water-resistant properties of the panels ensured safety and durability in Riyadh’s varied climate.
Today, the Riyadh Boulevard stands as a testament to the transformative power of innovative materials like ACFA Panels, overcoming logistical and operational challenges with ease.
Riyadh Boulevard Project
Project Overview
Project Name: Riyadh Boulevard Project
Location: Riyadh, Saudi Arabia
Client/Owner: Riyadh Boulevard
Architect/Designer:
Contractor: Aswar Alnasar Contracting
Project Duration: 2 Months
Project Background
Objective: Large-scale construction project in a densely populated urban area requiring innovative solutions for speed and efficiency.
Building Type: Commercial & Entertainment Complex
Scope of Work: Exterior Wall Façade Installation
Product and Material Details
Brand/Type: ACFA Lightweight Concrete Wall Panels
Thickness/Dimensions: Standard ACFA Panel Specifications
Quantity Used: 4500 SQM
Key Product Features:
Quick Installation (3x faster than traditional blockwork)
Lightweight
Fire Resistance
Water Resistance
Cost Efficiency
Installation Process
Preparation Work:
The densely populated location required logistical planning for smooth material delivery. The installation had to minimize disruption in the surrounding area.
Installation Technique:
Fixing Methods: ACFA Panels were installed using a lightweight framework to reduce structural load. The panels were secured with specialized rods for added durability and stability.
Surface & Joint Treatments: The joints were treated with high-performance sealants, eliminating the need for plastering.
Painting/Finishing Work:
ACFA Panels provided a smooth finish, reducing the time and costs of additional rendering or aesthetic treatments.
Challenges Faced:
Tight deadlines in a high-traffic area required fast and efficient installation.
Managing large-scale operations while minimizing noise and disruption.
Managing the high elevation of the wall, nearly 20 meters tall
Solutions Implemented:
ACFA Panels allowed rapid construction without plastering.
The lightweight design simplified logistics, and pre-planned workflows ensured efficiency.
ACFA Panel guaranteed the lightweight and strength which made it convenient for risk free installation on a steel structure frame.
Outcomes and Benefits
Final Appearance:
The Riyadh Boulevard stands as an architectural landmark, seamlessly integrating modern and traditional aesthetics.
Performance Highlights:
Weather Resistance
Cost Efficiency (saving SR 30 per square meter by avoiding plasterwork)
Fire and Water Resistance
Lightweight construction reduced structural load.
Client/Stakeholder Feedback:
Stakeholders appreciated the cost-effectiveness, timely delivery, and superior performance of the Acfa Panels. The project was completed ahead of schedule without compromising quality.
Visual Documentation
Photos of the following:
Initial Site Condition
Installation Process
Completed Project
Key Learnings
Material selection plays a crucial role in project speed and efficiency.
Pre-planned logistics are vital for dense urban construction.
Innovations/Unique Features Introduced:
Elimination of plastering, saving costs and time.
Use of ACFA Panel to accelerate construction while maintaining structural integrity and safety.